December 14,2011 – Floor Covering News
by Lew Migliore
The installation of any flooring material requires the subfloor or substrate to receive some type of preparation before the installation takes place. That could be as simple as acclimating the space to the appropriate temperature prescribed by the flooring manufacturer so the material is not shocked when it comes in contact with the substrate.
But the questions arise: What amount of floor prep should be done as part of the bid work for the installation? And, what amount is extra that would not be considered part of the standard practice for installing the flooring material? Read More…

